SURYA VIDYUT LIMITED

  •  
  • The Pratapgarh Solar Power Plant of 9 MW was commissioned on 4th. March 2012.
  • The inauguration ceremony done on 19.04.2012 by Honorable minister of Gujarat Govt. Mr. Bashan Bhai Ahir . 
  •  This plant was erected  as a research center for measuring performance of various types of Solar PV modules like C-Si, A-Si & Cd-Te with fixed structure and single axis tracking mechanism.  
  • This Plant was commissioned within 129 days from start date of the project.    
  •  Project taken up for green belt by propagation of Grass on 100% area of the total land of 73 Acres where yearly rainfall is  only 400-600 mm and dry climate with maximum ambient temperature of 45-490·       
  • Intention is to implement of ISO 9001: 2008, ISO 14001: 2004 and OHSAS 18001: 2007 like other plants of this company.
  • Performance monitoring up-to string level through SCADA, which is normally not done in Solar Plant.
  • Arrangement has been made to protect all equipment from fire.
  • CSR activities have started for local school and villages. 

ACHIEVEMENTS

 

Annual generation is higher by 14.21% w.r.t. simulated value.

Received two times Gold Award for “Solar Power Project of the Year2012 & 2013” Judged by Asian Power. 

Record one day Generation and Net Export was observed on 28.02.2013. CUF (Gen): 26.45% & CUF (Export): 25.26%

 Zero accident since start  of the project

 This project has been registered with United Nation’s Convention for Climate Change (UNFCCC)  as a successful project under the Clean Development Mechanism (CDM).

Reduction of auxiliary power by 11.76% with respect to same period of last year (April to June).

 

 